Amenity Water Limited Logo

Arundel Flood Defences

Arundel Flood DefensesWorks were completed in 5 areas around the historic town of Arundel to repair low spots in the flood embankments protecting the town and surrounding farmland from the tidal River Arun. The works were for the Environment Agency and lasted 8 weeks. In this photo a long reach excavator fitted with a vibrating plate compacts a blend of imported material to ensure a sound free draining repair.