Amenity Water Limited Logo

Construction

With a design and consents in place we can provide our experienced people working with our own specialist machinery to carry out the construction phase of the works.

Earthworks where required are carried out using laser guided levels programmed with the design information.

The materials we use come from trusted suppliers with whom we have been trading for many years. Working nationwide we have developed a network of suppliers located in different geographic locations within the British Isles ensuring that the transport and consequent environmental costs associated with our works are minimised.

Rock Ramp Perturbation…

This project was to construct a rock ramp perturbation fish pass at the site of twin…

Construction of Fish…

This project was to replace an existing weir with three lower weirs to enable fish…

Weir Removal and Bridge…

This project was to break out an existing weir structure enabling migratory fish passage…

Construction of Flood…

This project was to construct a new flood embankment to protect domestic properties and…

Re-lining of Large Pond

This project was to re-line a leaking pond at the foot of the south downs. The original…

Structural…

This project was to replace a failing hard revetment on the banks of the River Cherwell…

Flood Embankment Repair…

This project was to reinforce an existing flood embankment that protects farmland…

Large woody debris and…

This project involved the installation of large woody debris over 3 kilometres at two…