Amenity Water Limited Logo

Historic Wall Rebuild

magdalen 2019 during magdalen 2019 completedThis 85 metre repair of ancient stone wall required new footings as well and so a temporary sheet pile dam was installed along with silent running electric pumps to enable works to be carried out beneath water level before the new wall was constructed above.